- Must be ordered. Ready for shipment in 14 days
- Shipping time: 15 - 16 workdays
-
Primary: 2 x 115v (230v)
Secondarys:
120v 50mA (red)
18 v 1.2A (blue)
18v 0.4A (yellow)
Items with Secondary: 50V - 150V
- Page 1 of 1
- 2 Items Found, Show items 1 - 2
- List
- Gallery
- Must be ordered. Ready for shipment in 56 days
- Shipping time: 57 - 58 workdays
-
Primary: 220V, 50/60Hz., 120V or 240V, 50/60Hz
Secondaries:
560V & 100V (280-50-0-50-280) at 200mA center tapped
6.3V (3.15-0-3.15) at 6A center tapped